Back to All Events

Dry-In Event

We will be installing plywood and waterproofing on the sides of the building and on the roof of the building. This will involve heavy and awkward lifting. Some basic carpentry skills is needed to perform cuts on the plywood.

Earlier Event: December 17
Electrical Rough-In
Later Event: January 7
Insulation